Aerial view of the Jensen Beach causeway under construction. Bridge replacement construction began in 1955 and was completed in sections over a ten-year period.
Long arch bridge with construction or repair framing. This may be the seven-mile bridge to the Florida Keys, which was completed in 1912. The original seven-mile bridge was built for the F. E. C. Railroad.
Construction crew works on building the Veterans Memorial Bridge in Palm City. A large crane holds a giant bucket over the construction crew as they work.